Pantry Construction – Phase 1

Phase I of construction involved removing existing louvers and replacing them with wall, windows, and the front door; raising the slab to be level with the area that will be Phase II; installing a sewer line; installing an ADA accessible bathroom, installing a hand washing sink and food prep sink that will be utilized for preparation of food from The Garden in Phase II; installing a climate control system that is up to code for occupancy; building a delivery ramp from the back door to the storefront area; building a half-wall to separate the delivery ramp from the storefront area; installing a drop ceiling; adding drywall to the existing walls; installing wiring for wi-fi and computer accessibility.